Lynn allows data centers without a special permit in light and heavy industrial districts, but requires special permits in some others and bars them in certain districts. Projects of 5,000 square feet or more may also need site plan review.
current law · City of LynnAllows data centers by right in light and heavy industrial districts, and only by special permit in certain other zoning districts.Lynn Zoning Ordinance (2025)
What this means
Data centers are covered as indoor telecommunications: they are allowed by right in light and heavy industrial districts, but need a special permit in several other districts and are barred in some districts (use table). Site plan review can also apply to projects with 5,000 square feet or more, so the measure creates some approval burden while still providing clear places to build.
People behind it
- Lynn City Council
The ordinance identifies the City Council as the body that may amend it and as the special permit granting authority unless otherwise specified (“The City Council may from time to time”).
- Building Commissioner
Responsible for administering and enforcing the ordinance (“administered and enforced by the Building Commissioner”).
Restrictions & requirementsHide restrictions & requirements12
Data centers are defined under Indoor Telecommunications. That use is prohibited in CIV, R1, R2, R3, and MV districts; requires a special permit in R4, B1, B2, BC, M1, M2, RD, and RT; and is permitted as of right in IL and IH. Data Center Indoor telecommunications
Where a special permit is required, the City Council is generally the granting authority and must make a written determination that the proposal’s adverse effects will not outweigh its benefits. The application is subject to public-hearing procedures and notice posted at the property at least 14 days beforehand; a permit may lapse if substantial use or construction has not begun within three years, except for good cause. City Council fourteen days
A building permit is required before a building is erected, moved, added to, or structurally altered, and a certificate of occupancy is required before the building or land is occupied or its use is changed. Permit required
Site plan review is required for construction, reconstruction, expansion, or extension of buildings on a lot where the combined gross floor area of all structures is at least 5,000 square feet. Review uses public-hearing procedures, and approval may lapse after three years if substantial use has not begun, subject to a possible extension for good cause. equals or exceeds 5,000 square feet Site Plan Approval shall lapse
The special permit granting authority and Site Plan Review Authority may charge reasonable administrative and consultant fees. consultant fees
Indoor Telecommunications uses require one off-street parking space per 3,000 square feet of gross floor area. The general parking requirement does not apply in the Central Business District, and any reduction elsewhere requires a Zoning Board of Appeals special permit. Indoor telecommunications shall not be reduced
Required parking generally must be on the same lot. The Site Plan Review Committee may allow off-site parking within 1,320 feet if specified conditions are met; in IL and IH districts, parking may be on a contiguous lot or a separate lot within 1,000 feet if the lots are under the same ownership or control. within 1,320 feet IL, and IH zoning districts
New or redeveloped parking lots with 15 or more spaces must make at least 25% of spaces EV-ready and equip at least 10% with Level 2 or higher charging stations. 15 or more parking spaces
Buildings with more than 50,000 square feet of gross floor area must provide one internal bicycle parking space for every 10,000 square feet. over 50,000 square feet
Adequate off-street loading spaces must be provided for nonresidential buildings erected, enlarged, or altered after the section’s effective date. Loading adequacy is determined by the Site Plan Review Committee or, for uses not requiring site plan review, Inspectional Services. Adequate off-street loading spaces
Landscaping requirements apply to projects requiring site plan approval, nonresidential uses within or adjacent to residential zones, and site improvements altering more than 1,000 square feet. Required landscape buffers must be at least six feet wide and include specified screening plantings or fencing; surface parking is prohibited within a required buffer. site improvements that alter more than 1,000 square feet at least 6 feet wide
Buildings must meet the applicable district’s dimensional requirements, including limits on lot coverage, floor area ratio, and height, as well as setback requirements. Table of Dimensional Requirements
Benefits & exceptionsHide benefits & exceptions5
Data centers are defined as indoor telecommunications uses. They are permitted by right in the Light Industrial (IL) and Heavy Industrial (IH) districts, without a special permit. Data Center
A data center may seek a special permit in R4, B1, B2, BC, M1, M2, RD, or RT districts. It is not allowed in the other listed districts, including MV. Indoor telecommunications
In IL and IH districts, required parking may be placed on the same lot, a contiguous lot, or a separate lot within 1,000 feet, provided the lots are under the same ownership or control. within 1,000 feet
The parking schedule requires one off-street space per 3,000 square feet of gross floor area for indoor telecommunications uses. Indoor telecommunications
In IL and IH districts, the dimensional table allows a maximum floor-area ratio of 3.0, maximum building height of 60 feet, maximum impervious lot coverage of 95%, and requires at least 15% green space. Table of dimensional requirements