City of Everett
Anti-Data Center Policies
Everett’s enacted law bars large data centers, while smaller ones may seek special permits subject to strict size, capacity, power, water, noise, jobs, and generator conditions.
current law · Everett Docklands Innovation DistrictProhibits large data centers in Everett’s Docklands Innovation District, while allowing smaller facilities only with a special permit and subject to requirements for water use, noise, power, backup generators, and local jobs.Massachusetts C0007-26 (2026)
What this means
The revised proposal would prohibit large data centers and allow only small ones to seek a special permit under strict size and capacity limits. Small facilities would also face demanding power, water, noise, job, and backup-generator conditions before receiving approval, making development substantially harder without banning every data center.
People behind it
- Councilor Katy P. Rogers
Named sponsor of the original ordinance seeking to prohibit data centers in the Everett Docklands Innovation District.
- Councilor Vivian Nguyen
Named co-sponsor of the original ordinance seeking to prohibit data centers in the Everett Docklands Innovation District.
- Councilor Stephanie Martins
Named co-sponsor of the original ordinance seeking to prohibit data centers in the Everett Docklands Innovation District.
Show 3 more peopleShow fewer people
- Department of Planning & Development
Its staff researched the issue and prepared the revised draft ordinance that replaced the original proposal.
- Planning Board
Proposed the revised draft ordinance and voted to recommend it favorably, with amendments, to the City Council.
- Councilor Stephanie Smith
Named as the introducer of the revised ordinance in the ordinance text.
Restrictions & requirementsHide restrictions & requirements9
The original draft would prohibit data centers and data-processing facilities throughout the Everett Docklands Innovation District. The Planning Department’s revised draft was intended to replace that draft in full, so the blanket ban is not part of the revised approach.
Under the revised draft, large data centers are prohibited in the district. The definition covers a center occupying over 20,000 square feet and/or exceeding 5 MW capacity, whichever threshold is lower. Small centers—up to 20,000 square feet and/or up to 5 MW, whichever is less—require a special permit and cannot be the structure’s primary use.
A qualifying on-site computer room with information-technology equipment power density over 20 watts per square foot is ancillary to the on-site use and may not exceed 10% of the building’s square footage without a special permit.
A small data center seeking a special permit must use a closed-loop or similar cooling system using only non-potable water. The applicant must submit a maintenance plan specifying expected daily water use, system maintenance, flushing frequency, and treatment before discharge.
A small data center must be set back at least 200 feet from residential or noise-sensitive uses, unless the applicant provides a noise study that the special-permit authority finds adequately demonstrates that the design will prevent adverse noise impacts.
The applicant must provide sufficient renewable power from on-site generation or off-site generation delivered by a dedicated transmission line. The applicant must pay the full cost of that line and make the facility’s utility usage publicly available monthly.
Backup generators may operate only when the electrical grid is down. They must use the least-intrusive feasible energy source; diesel is prohibited.
A small data center must substantially add livable-wage, permanent local jobs by directly supporting high-employment industries within the City of Everett, as a finding required for a special permit.
Applicants must identify on a plan the locations of noise monitors to be installed on or around the site. If generators will be used, they must submit a report describing their locations, capacities, estimated cycling frequency, fuel or energy source, and generator-specific noise study.
Benefits & exceptionsHide benefits & exceptions4
Small data centers may seek a special permit in the EDID. The draft defines “small” as up to 20,000 square feet and/or up to 5 MW, whichever limit is lower, and says a data center cannot be the structure’s primary use.
Computer rooms serving an on-site permitted use are excluded from the data-center definition. An ancillary computer room may occupy up to 10% of the building’s area without a special permit.
A permitted data center may use backup generators, but only when the electrical grid goes down; the draft allows natural gas or sustainable energy and prohibits diesel.
A proposed data center may meet its electricity needs through renewable generation on site or off-site generation delivered by a dedicated transmission line. The proponent must pay for the dedicated line and provide sufficient power to operate and maintain the facility.
Sources
pending · City of EverettWould restrict data centers citywide by banning large facilities and allowing small ones only by special permit in certain districts, subject to requirements for water use, noise, power, backup generators, and local jobs.Everett Massachussetts Section 2 definitions and Section 38 data center zoning ordinance (2026)
What this means
The proposed rules would prohibit large data centers in every district, while small ones could seek permits only in selected districts and would face demanding conditions on water, noise, power, and jobs (large centers would be prohibited in all districts). That would make building or expanding data centers substantially harder, though the limited path for small centers means it is not a complete ban.
People behind it
- Robert J. Van Campen
The Mayor introduced the citywide data-center ordinance. introducing an Ordinance regulating
- Councilor Stephanie V. Smith
Listed as the councilor offering the citywide data-center ordinance. Offered By: Councilor Stephanie Smith
Restrictions & requirementsHide restrictions & requirements8
The ordinance defines a small data center as no larger than 20,000 square feet and/or 5 MW of capacity, whichever is less, and says it cannot be a structure’s primary use. A facility exceeding either threshold is large. The small-center size and capacity limits
Large data centers are prohibited in every city zoning district and cannot obtain a use variance. Small data centers may be considered by special permit in the Industrial, Lower Broadway Economic Development, Waterfront Mixed-Use, Commercial Triangle Economic Development, and Everett Docklands Innovation districts; they are prohibited in several other districts and overlays, including the listed Lower Broadway subdistricts, and cannot obtain a use variance there. Large centers prohibited in all districts
A small data center needs a special use permit, and the permit authority must make specified findings before granting it. Special permit findings required
Cooling must use a closed-loop or similar system that uses only non-potable water. Applicants must also submit a cooling-system maintenance plan stating expected daily water use, maintenance and flushing frequency, and how water will be treated before discharge. Non-potable cooling and water-plan requirements
A data center must be at least 200 feet from residential or noise-sensitive uses unless the permit authority accepts a noise study showing the design will prevent adverse impacts. Applicants must also show on a plan where noise monitors will be installed. The 200-foot setback and noise-study exception
The proponent must provide enough renewable power generation on site, or off-site generation with a dedicated transmission line, to operate and maintain the center without affecting local rates; the proponent must pay for that power arrangement. Utility usage must be made public monthly. Power-generation and cost requirements
Backup generators may operate only when the electrical grid is down; they must use the least-intrusive energy source possible, and diesel is prohibited. Applicants proposing generators must submit a report on their location, capacity, estimated cycling frequency, energy source, and generator-specific noise study. Backup-generator restrictions and reporting
The proposal must substantially add permanent local jobs at a livable wage by directly supporting high-employment industries. The Everett Docklands draft specifies that those industries must be within 1,000 feet of the proposed center. Local-job finding in the citywide proposal
Benefits & exceptionsHide benefits & exceptions3
Small data centers may seek a special use permit in specified districts, including the Industrial District, Waterfront Mixed-Use District, Commercial Triangle Economic Development District, and Everett Docklands Innovation District. A small data center is capped at 20,000 square feet and/or 5 MW, whichever is less, and cannot be the structure’s primary use; approval is subject to the ordinance’s special-permit findings and requirements.
An on-site computer room ancillary to an otherwise allowable use may occupy up to 10% of the building’s floor area without a special permit, if it meets the ordinance’s definition of a computer room.
The ordinance provides a route for a permitted small data center to obtain power through sufficient renewable generation on site or off-site generation connected by a dedicated transmission line. The proponent must pay for the generation or line, and the arrangement must avoid affecting local rates.