City of Chicopee
Mixed Data Center Policies
Massachusetts requires covered data-center projects above 25 megawatts to meet community-benefit and environmental conditions for permits, while qualifying large projects may receive 20-year tax exemptions. The exemptions have investment, size, and job requirements, and applications are not currently being accepted.
Rating and summary from Massachusetts statewide as there are no scored current or future laws outside temporary restrictions for City of Chicopee.
pending · City of ChicopeeWould require data centers to obtain city approval in industrial districts and meet proposed standards for power, water, noise, emissions, and municipal-service impacts; the measure is a proposal, not an enacted law.Proposed Chicopee data center ordinance amendment (2026)
What this means
The proposal allows low-impact data centers only in industrial districts with City Council approval, while barring them elsewhere (Tier 1 facilities require a special permit). Applicants would also face demanding checks on power, water, noise, and municipal services, plus ongoing reporting and five-year permit renewals. That creates significant obstacles to building and operating centers, despite leaving a path for some smaller projects.
Timing
- Ends
- when a proper ordinance establishing zoning restrictions and operating requirements is established
People behind it
- Frank N. Laflamme
Named in the agenda as the proposer of the camping, loitering, and renewable-energy/BESS ordinance measures, and as a sponsor of several proposed parking and stop-control ordinances; the article also identifies him as proposer of the renewable-energy amendment. The agenda identifies the ordinance proposer.
- Mary Beth Pniak-Costello
Named as the sponsor of the proposed moratorium on battery energy storage facilities. The agenda attributes the moratorium to Pniak-Costello.
- William Courchesne
Named as the proposer of the substance-abuse-treatment-center and data-center ordinance measures, and as a sponsor of proposed parking ordinances; the article also identifies him as proposer of the data-center amendment. The agenda names the data-center ordinance proposer.
Show 4 more peopleShow fewer people
- Doug Girouard
Named as a sponsor of proposed stop-sign and one-way-street ordinances. The agenda lists Girouard with the proposed traffic measures.
- Susan Goff
Named as the sponsor of a proposed parking ordinance. The agenda lists Goff as sponsor.
- George A. Balakier
Named as the sponsor of a proposed parking ordinance. The agenda lists Balakier as sponsor.
- Mayor
Responsible for the mayoral appropriation orders and submitted mayoral appointments for Council confirmation. The agenda identifies these as the Mayor’s appropriations.
Restrictions & requirementsHide restrictions & requirements11
Data centers are prohibited in all zoning districts except industrial districts; only Tier I facilities, with maximum projected electrical demand of 2 MW or less, are expressly allowed there, and only by City Council special permit.
A special-permit application must meet the general special-permit requirements and additional performance standards, including written evidence from Chicopee Electric Light that electric capacity is available without impairing service to existing customers.
Applicants must document projected water use and cooling methods and provide Department of Public Works documentation that water demand can be accommodated without harming system reliability, fire protection, or existing users. Potable-water-intensive evaporative cooling is strongly discouraged and must be justified if no lower-water alternative is practicable.
Continuous operational noise at the designated compliance point may not exceed 50 dBA from 7 a.m. to 10 p.m. or 45 dBA from 10 p.m. to 7 a.m.; noise studies, post-construction monitoring, and corrective mitigation may also be required.
Backup generators are limited to emergencies and scheduled testing, subject to applicable codes and approved testing schedules; applicants must identify generator details and demonstrate compliance with emissions standards.
Buildings and equipment must be designed to reduce impacts on neighboring properties; mechanical equipment, generators, and substations must be screened from public ways and adjoining properties, and exterior lighting must prevent spillover.
Applicants must show the facility will not unduly burden municipal services and infrastructure, including fire, police, public works, water, sewer, and electric systems. Required upgrades or mitigation must be cost-estimated, with responsibility for funding identified.
The City may condition approval on limits for electrical demand or water use, monitoring or reporting, generator-testing restrictions, and phased development tied to demonstrated infrastructure capacity.
The special permit lasts five years. Renewal by the City Council is required to continue operating, and the holder must apply at least 90 days before expiration; failure to apply causes the permit to lapse.
An increase in electrical demand above the permitted MW threshold requires modification of the special permit. Changes in ownership or operation do not remove the obligation to comply with permit conditions, and written notice to the Department of Public Works is required before an operator change.
The Department of Public Works may require operations reports: monthly during months 1–3, twice during months 4–12, and annually from year 2 onward. Reports may have to cover electrical demand, water use, compliance, discharges, and operational changes.
Benefits & exceptionsHide benefits & exceptions3
Tier I data centers—those with projected demand of 2 MW or less—may seek a City Council special permit in industrial districts; data centers are prohibited in other zoning districts. Tier I ... permitted only by Special Permit
A data-center special permit is valid for five years, and the operator may apply for renewal to continue operating. Renewal depends on timely application and review of compliance, operational performance, infrastructure impacts, and proposed changes; the Council may renew with or without modified conditions or require a new application for substantial changes. valid for a period of five (5) years
A special permit runs with the land and binds successors, assigns, and operators, so a change in ownership or operator does not itself end the permit. The new operator must continue meeting its conditions and provide written notice before the change. shall run with the land