Loading map…
Regbase

The Data Center Divide

Bossier Parish

Pro-Data Center Policies

Bossier Parish allows data centers by right in I-1 and I-2 industrial districts, without separate planning approval, but sites near homes or residentially designated land face setbacks and screening and landscaping requirements, including a 50-foot minimum.

current law · Unincorporated areas within five miles of Benton
Permits data centers by right in light- and heavy-industrial districts in unincorporated areas within five miles of Benton, subject to setback and buffering rules near residential properties.Bossier Parish Ordinance No. 5071 (2025)

What this means

The ordinance would allow data centers by right in I-1 and I-2 industrial districts, avoiding a separate planning approval for the use (“Data Center”). However, sites near homes or residentially designated land would face setbacks and screening and landscaping requirements (“minimum of fifty (50) feet”). Overall, the easier approval path is a meaningful benefit, partly offset by those site requirements.

People behind it

  • Offered Ordinance No. 5071 and moved to approve the Benton Metropolitan Planning Commission’s proposed zoning and subdivision regulation amendments.

  • Seconded the motion to adopt Ordinance No. 5071 and approve the proposed amendments.

  • Submitted the application proposing amendments and updates to zoning definitions, uses, maintenance, and subdivision regulations within its jurisdiction.

Restrictions & requirementsHide restrictions & requirements3
  • In I-1 and I-2 districts, nonresidential data-center buildings, including accessory buildings, must be set back at least 50 feet from property adjacent to an existing one-family residential use, an existing residence, or vacant land zoned or designated for residential use.

  • In I-1 and I-2 districts, a data-center site adjacent to existing or proposed one-family residential uses must install an 8-foot screening fence or wall along the adjoining property lines, using wood, brick, stone, or masonry with consistent exterior finishes.

  • In I-1 and I-2 districts, a data-center site adjacent to existing or proposed one-family residential uses must provide a 25-foot landscaped buffer with evergreen trees that are at least 3 inches in caliper and at least 10 to 12 feet high at planting, spaced at one tree per 20 linear feet of buffer.

Benefits & exceptionsHide benefits & exceptions3
  • In the unincorporated areas within five miles of Benton, data centers are expressly permitted by right in both I-1 light industry and I-2 heavy industry districts, avoiding case-by-case planning-commission approval for the use itself. The approval remains subject to applicable district requirements, including compatibility setbacks and buffers where the site borders residential uses.

  • The definition of a data center expressly includes associated accessory uses such as management headquarters, training centers, and research-and-development offices, allowing these functions to be included as part of the data-center operation.

  • For I-1 and I-2 sites, the ordinance establishes specific compatibility standards for nonresidential buildings near residential uses: a minimum 50-foot setback, an 8-foot screening fence or wall, and a 25-foot landscaped buffer with specified evergreen-tree requirements. These standards provide defined siting requirements, but may limit development near existing or planned residential areas.

Sources

Data provided by Regbase · Cookie preferences · Report missing data