City of El Dorado
This restriction takes precedence for the map color while in effect.
Mixed Data Center Policies
El Dorado bars large data centers above specified power or water thresholds for ten years; smaller facilities are not covered, though the description conflicts on enactment.
Rating from Kansas statewide as there are no scored current or future laws outside temporary restrictions for City of El Dorado.
current law · City of El DoradoProposes prohibiting data centers with peak electrical loads over 10 megawatts or daily water use over 100,000 gallons for 10 years, unless voters approve a change.El Dorado, Kansas, Prohibit Data Centers and Battery Energy Storage Systems Initiative (November 2026)
What this means
If enacted, the measure would prohibit building and operating data centers above its stated power or water thresholds for ten years, with changes during that period allowed only by a vote of the electors (prohibiting the installation and operation of High Impact Data Centers). Smaller data centers below those thresholds are not covered.
Timing
- Ends
- ten (10) years after adoption
If adopted, the ordinance prohibits installation and operation of the specified facilities for ten years. During that period, it may be repealed or amended only by a vote of the electors.
Restrictions & requirementsHide restrictions & requirements2
Prohibits installing or operating a High Impact Data Center, defined as one with a peak electrical load exceeding 10 megawatts or a daily water draw exceeding 100,000 gallons. The prohibition and thresholds
The ordinance would remain in effect for 10 years and could not be repealed or amended during that period except by a vote of the electors. The 10-year term and voter exception