Ogle County
Anti-Data Center Policies
Ogle County allows data centers as a special use in industrial districts, but they need a permit that adds review and may cause delays or uncertainty. The descriptions identify no data-center-specific operating limits.
current law · Unincorporated areasRequires data centers to obtain a special-use permit in Ogle County’s industrial district.Ogle County Zoning Ordinance Amendment — I-1 Industrial District Data Centers and Power Plants Special Uses
What this means
The measure creates a clear route for data centers in industrial districts, but requires a special-use permit, adding review, possible delay, and uncertainty; data centers are specifically listed as a special use (“Data Centers”). The sources do not describe data-center-specific operating limits, so the main practical burden is obtaining approval rather than meeting new operating standards.
People behind it
- Mark Miller
Ogle County Planning and Zoning Administrator who filed and proposed the text amendment under the direction of the Assessment, Planning and Zoning Committee.
- Assessment, Planning and Zoning Committee
Ogle County committee under whose direction the text-amendment request was filed and which was responsible for initiating the amendment process.
- Constellation Energy Generation, LLC
Petitioner for Map Amendment #02-24 to change multiple parcels from agricultural to industrial zoning.
Show 3 more peopleShow fewer people
- Benjamin Schuster
Agent for Constellation Energy Generation, LLC in Map Amendment #02-24.
- Elrod Friedman LLP
Legal representative or agent for Constellation Energy Generation, LLC in Map Amendment #02-24.
- Dan Janes
County Board member who presented and moved for approval of Map Amendment #02-24.
Restrictions & requirementsHide restrictions & requirements11
Data centers are allowed in the I-1 Industrial District only as a special use, so they require approval of a special use permit rather than being permitted as of right. Data Centers
An I-1 data-center site must contain at least 1 acre and have at least 100 feet of lot width measured at the building line. Every lot or tract of land
Buildings and structures in I-1 may occupy no more than 40 percent of the lot area, including accessory buildings. Not more than forty percent
I-1 structures are generally limited to two stories or 35 feet, whichever is less; a greater height requires a special-use authorization with the permitted height specified as a condition. shall not exceed two (2) stories or thirty-five feet
I-1 buildings must meet front setbacks of 60 feet from tollways, freeways, and limited-access highways; 80 feet from federal or state highways; 60 feet from county highways; and 40 feet from township roads or other roads and streets. front yard
I-1 side yards must generally be 10 percent of lot width, capped at 25 feet; at least 25 feet is required where the lot abuts a residence district, and a side yard adjoining a road must meet the applicable front-yard setback. Two side yards
I-1 buildings must have rear yards of at least 25 feet; where the rear yard abuts a residence district, it must meet the adjoining residence district's rear-yard requirement, which may be greater. All buildings shall have rear yards
Data centers must provide off-street parking and loading facilities, with the applicable requirements and setbacks governed by Division 7. Off-street parking and loading requirements
Within 150 feet of a residence district, all storage associated with an I-1 use must be inside completely enclosed buildings or structures. Elsewhere in I-1, open storage must be enclosed by solid walls or fences at least 8 feet high, no lower than the stored materials, and suitably landscaped. Within one hundred fifty feet
I-1 operations must comply with industrial performance standards governing noise, vibration, smoke and particulate matter, water or other effluent, toxic or noxious matter, fire, glare, heat, and radiation under the Illinois Environmental Protection Act. conform to the Industrial Performance Standards
Exterior lighting for I-1 uses must be shaded when necessary to prevent direct light from shining onto public streets or parks. Exterior lighting fixtures shall be shaded
Benefits & exceptionsHide benefits & exceptions6
Data Centers are expressly listed as a special use in the I-1 Industrial District, creating a defined zoning pathway for approval rather than requiring an unlisted-use interpretation.
I-1 buildings and structures may exceed the standard two-story or 35-foot height limit when authorized by special-use-permit conditions, allowing a data center’s height to be approved specifically through the permit.
I-1 zoning permits lots as small as one acre with a minimum 100-foot building-line width, subject to the other applicable district requirements.
I-1 zoning allows buildings and structures, including accessory buildings, to occupy up to 40% of the lot area.
Devices for generating energy, including solar panels and private wind energy conversion systems, are allowed as accessory uses in I-1, subject to the specified setback and waiver requirements.
Lawfully established I-1 uses that later become nonconforming because of an ordinance change may continue under the ordinance’s nonconforming-use rules, providing potential protection against future restrictions.
Sources
Specific to Ogle County only.
pending · Unincorporated areas subject to Ogle County zoningProposes allowing data centers only with conditional-use approval in industrial districts and setting water, energy, noise, and vibration standards; it has not been adopted.Ogle County Data Centers Special Use Provisions for I-1 Industrial Zoning District — Draft Ordinance
What this means
The proposal would allow data centers in industrial districts, but only after multiple approvals and compliance with performance requirements for water, energy, noise, and vibration (“only be allowed through conditional use approval”). Those added reviews and standards could mean extra costs and delays, but the sources do not describe a ban or quantify how demanding the requirements would be.
People behind it
- Ogle County Board
Introduced the first reading of the proposed data center ordinance and will consider it for final adoption.
- Ogle County Zoning Board of Appeals
One of the bodies identified as responsible for administering conditional-use approvals for data centers.
- Ogle County Regional Planning Commission
One of the bodies identified as responsible for reviewing proposed data center conditional uses.
Show 1 more peopleShow fewer people
- Constellation Energy Generation
Requested the rezoning and zoning-code text amendment that added data centers as a proposed special use in industrial districts.
Restrictions & requirementsHide restrictions & requirements3
Data centers may be located only in industrial zoning districts through conditional-use approval.
A proposed data center must receive approval from the Zoning Board of Appeals, the Regional Planning Commission, and the County Board.
The ordinance establishes performance requirements governing water use, energy consumption, noise, and vibration.
Benefits & exceptionsHide benefits & exceptions3
Allows data centers as a special use in I-1 Industrial zoning districts, making them eligible for development on land classified for industrial use.
Creates a conditional-use approval pathway for data centers through review by the Zoning Board of Appeals, Regional Planning Commission, and County Board.
Rezoned approximately 524 acres around the Byron Generating Station from agricultural to industrial use, making the parcels eligible for industrial development that may include data centers as a special use.
Sources