Upson County
Pro-Data Center Policies
Upson County’s enacted rules allow data centers in industrial districts and a technology overlay, with greater building height, but require planning review and overlay setbacks and residential buffers.
current law · Unincorporated areas and inactive municipalities within Upson CountyCreates a technology overlay district that allows data centers and sets requirements for site plans, building height, setbacks, parking, and buffers.Upson County Technology Overlay District Zoning Ordinance Amendment (2025)
What this means
The proposal would expressly allow data centers in the county’s industrial districts and create a technology overlay with a higher building-height allowance, making development more feasible (data centers listed as permitted uses). It also requires planning review and adds setbacks and residential buffers in the overlay, so the overall benefit is meaningful but limited by added conditions (overlay setbacks and buffers).
People behind it
- Upson County Board of Commissioners
Adopting body responsible for approving and enacting the zoning amendment and Technology Overlay District ordinance.
- Upson County Planning Commission
Responsible for reviewing proposed development within the Technology Overlay District and administering and enforcing the district's provisions.
- Thomaston-Upson Industrial Development Authority
Identified as collaborating in the development of the Technology Overlay District boundaries.
Restrictions & requirementsHide restrictions & requirements12
Data centers are added as permitted principal uses only in the M-1 and M-2 districts and within the Technology Overlay District; development outside those applicable districts would require another zoning authorization. data centers
Technology Overlay District boundaries must be developed with the Thomaston-Upson Industrial Development Authority and approved by both the Planning Commission and Board of Commissioners. boundaries
A master development plan must be submitted to and approved by the Planning Commission before development is proposed within the Technology Overlay District. master development plan
Development within the Technology Overlay District is subject to site-plan review and approval by the Planning Commission. site-plan review and approval
Buildings in the Technology Overlay District may be up to 70 feet high only subject to Planning Commission approval; the general height limit otherwise remains 35 feet, with increased yards required for taller projections. 70 feet
Technology Overlay District buildings must meet minimum setbacks of 50 feet from the front, side, and rear property lines. minimum setbacks
Data-center development in the Technology Overlay District must provide adequate parking under Upson County's off-street parking standards, creating a site-design and potential construction requirement. parking requirements
A landscaped buffer is required along Technology Overlay District property lines adjoining residential districts, including A-R. The buffer must be at least 30 feet wide, use dense trees and shrubs with trees planted 10–15 feet apart, and include a submitted landscaping and buffer plan; existing vegetation may receive credit. minimum width: 30 feet
The Planning Commission may require an additional solid fence or wall at least eight feet high along the Technology Overlay District buffer, adding a possible construction and maintenance obligation. solid fence or wall
Technology Overlay District development must comply with all applicable environmental regulations, including erosion and sediment-control requirements under state law and Upson County ordinances. environmental protection
Technology Overlay District buildings must follow a uniform modern, high-tech architectural aesthetic; the measure encourages sustainable materials and practices, while signage must comply with Upson County zoning-sign regulations. architectural design
Buffers and other required open spaces in the Technology Overlay District may not be encroached upon or reduced except as allowed by applicable yard, setback, parking, and other development standards, limiting later expansion or site alteration. open space not to be encroached upon
Benefits & exceptionsHide benefits & exceptions8
Data centers are added as expressly permitted principal uses in both the M-1 and M-2 districts, allowing them to be developed in those districts without requiring a separate special-exception approval or rezoning solely because they are data centers. Data centers
Data centers may be built up to 70 feet high in the M-1 and M-2 districts, instead of the otherwise applicable 35-foot maximum building height. 70 feet for data centers
Electrical support infrastructure needed by data centers—including substations, switch stations, other electrical equipment, and enclosures—is expressly permitted as an accessory use in the M-1 and M-2 districts. Electrical support infrastructure
Ancillary employee facilities, including cafeterias and childcare facilities, are expressly permitted as accessory uses in the M-1 and M-2 districts. Ancillary uses such as cafeterias
The new TOD-1 Technology Overlay District expressly permits data centers, technology-based manufacturing, research and development facilities, technology-company buildings, and technology-related educational and training facilities. The following uses are permitted within the Technology Overlay District
The TOD-1 expressly permits accessory employee facilities and electrical infrastructure, including substations, switch stations, other required electrical equipment, and enclosures. Electrical
Buildings in the TOD-1 may reach 70 feet in height, subject to approval by the Upson County Planning Commission; projections not intended for human habitation are exempt from the height limit, subject to increased yard requirements for structures over 35 feet. maximum building height
Development in the TOD-1 is reviewed through a master development plan submitted to the Planning Commission, providing a defined site-planning pathway for proposed technology projects. Master Development Plan
Sources
Data provided by Regbase · Cookie preferences · Report missing data