City of Gainesville
Neutral Data Center Policies
Gainesville’s zoning rules do not specifically target or incentivize data centers, but they must be permitted in the district where they are proposed; unlisted uses are prohibited, which may limit locations or expansion.
current law · City of GainesvilleDoes not specifically regulate data centers; their location depends on whether they fit a permitted use in the applicable zoning district.City of Gainesville zoning and subdivision ordinance (Appendix A—Zoning)
What this means
The article does not specifically target data centers or offer them incentives, but development must fit the zoning rules for its location. Uses not permitted in a district are prohibited, so the city’s classification of a data center could limit where it can be built or expanded and add some approval burden (unlisted uses are prohibited).
People behind it
- City manager or designee
Administers and enforces the airport zoning regulations. “All airport zoning regulations shall be administered and enforced”
Restrictions & requirementsHide restrictions & requirements3
A data center must be allowed in its zoning district: uses not permitted by right, by special-use permit, or as accessory uses are prohibited. If the city manager must determine whether a proposed use is permitted, the code allows consideration of factors including hours, site arrangement, vehicle trips, and whether the activity is independent of other site activities. Unpermitted uses are prohibited
In the airport height notification zone, a proposed structure that exceeds the applicable height threshold requires an airport obstruction permit: in subzone 1, the threshold is the runway-related surface rising one foot per 100 feet horizontally for 20,000 feet; in subzone 2, it is 200 feet above ground. The permit process requires FAA documentation and a valid aeronautical study, and a permit cannot be issued if the FAA finds an airport hazard. A permit is required for a potential airport obstruction
For an occupied structure in an airport noise zone, an otherwise unlisted use may be allowed only if the underlying zoning permits it and the development provides at least 25 dB of exterior-to-interior noise reduction and a permanent avigation easement. The code also prohibits or restricts specified uses in noise subzones, with some restricted uses limited to infill lots in neighborhoods or developments built before December 3, 2009. Unlisted uses must provide noise reduction and an avigation easement