Connecticut offers qualifying data centers long-term tax exemptions on property, equipment, services, and electricity, but projects must meet investment thresholds and negotiate a fee agreement with each host municipality before construction. The state also provides applicant assistance and interagency coordination.

Rating and summary from Connecticut statewide as there are no scored current or future laws outside temporary restrictions for Town of Thompson.

pending · Town of Thompson
Documents a planning and zoning subcommittee meeting, but the provided text does not show a data-center-specific law or regulation.Thompson Planning and Zoning Commission October 22, 2026 Subcommittee Minutes — proposed hyperscale data-center amendment
pending · Town of Thompson
Allows the Planning and Zoning Commission to consider a data center as an unlisted use through special-permit review; it does not specifically permit or prohibit data centers.Thompson Planning and Zoning Commission October 22, 2026 Subcommittee Minutes

What this means

Data centers are not specifically listed as a permitted use, and the rules say unlisted uses are not allowed unless the Commission accepts them for special-permit review as related to the district’s purpose (unlisted uses require Commission review). In the Business Development District, that route exists, but discretionary review and ordinary development standards can add uncertainty, cost, and delay (other related uses).

People behind it

  • Has authority to establish and amend zoning regulations and districts, enforce them, and decide applications (establish and amend zoning regulations and districts).

  • The Commission’s appointed agent responsible for interpreting and enforcing the regulations (interpreted and enforced by the appointed agent).

Restrictions & requirementsHide restrictions & requirements9
  • Uses not listed in the regulations are generally not permitted. In the Business Development District (BDD), an unanticipated use may be proposed for special-permit review only if the Commission determines it is reasonably related to the district’s purpose.

  • In the BDD, development on properties without public water and sewer requires at least 40,000 square feet of lot area and 15,000 square feet of net buildable area. With public water and sewer, the minimums are 4,500 square feet for both.

  • In the BDD, nonagricultural buildings and structures are limited to three stories.

  • In the BDD, the maximum lot coverage is 75% impervious surface.

  • BDD frontage and setbacks apply to primary buildings and accessory structures. Without public water and sewer, the listed frontage is 150 feet, with 40-foot front and 20-foot side and rear setbacks. With public water and sewer, nonresidential primary buildings require 50 feet of frontage and 10-foot setbacks; nonresidential accessory structures require 10-foot setbacks.

  • In the BDD, the Commission may require up to 50 additional feet of landscaped buffer between a commercial use and a residential or agricultural use, and may require further screening to address noise, light, or other nuisances.

  • BDD nonresidential permit applications must include a landscaping and buffering plan showing permeable and impermeable surfaces, low-impact-development measures, and planned plant species.

  • In the BDD, rubbish and waste disposal areas must be fenced or otherwise screened, and waste must be kept in appropriate closed containers.

  • In the BDD, lighting for off-street parking must be directed down toward the parking area and away from adjoining lots and public street rights-of-way.

Benefits & exceptionsHide benefits & exceptions1
  • An unanticipated use may be proposed for a special permit if the Commission finds it reasonably related to the district’s intended purpose. In the BDD, this applies to existing and new uses; approval is discretionary and not automatic.