Town of Southbury
Anti-Data Center Policies
Southbury allows data centers in the Industrial zone with special-exception and site-plan approval, applicant-funded traffic and environmental studies, and substantial site, screening, energy-use, and operating requirements. These conditions create significant hurdles but do not ban them.
current law · Town of SouthburyRequires data centers in Southbury’s Industrial Zone to obtain special-exception and site-plan approval, demonstrate access to high-capacity electricity and fiber, screen backup power equipment, and use renewable energy, waste-heat reuse, and energy-efficient cooling where required.Southbury Zoning Regulations, Sections 18.2.4 and 18.5.7
What this means
The measure would expressly allow data centers in the new Industrial zone, but only with special-exception and site-plan approval, plus applicant-funded traffic and environmental analyses (all special-exception applications). It also imposes substantial site, screening, energy-use, and operating conditions, creating meaningful costs and hurdles, though not a ban (Data Centers).
People behind it
- Zoning Commission
Approved the creation of the Industrial (IND) Zone and the zoning map amendment for 150 Kettletown Road from R-60C to IND.
Restrictions & requirementsHide restrictions & requirements15
Data centers in the Industrial (IND) Zone require a special exception and Planning Commission site-development-plan approval; applications must include traffic and environmental impact analyses at the applicant’s expense. special exception uses
IND development must meet dimensional limits: generally, at least 10 acres per lot, 200 feet of frontage and square-lot dimension, 200-foot street setbacks, 150-foot property-line setbacks, a 40-foot building-height cap, no more than 3 stories, 10% maximum building coverage, 20% maximum floor area, and 30% maximum ground coverage. Height or story limits may be exceeded only under the stated visibility review and, for height, emergency-service conditions. lot and bulk requirements
Applicants must submit an environmental impact statement identifying potential effects on wetlands, watercourses, aquifers and stormwater, compliance with state environmental rules, and proposed mitigation. environmental impact statement
Access must use state roadways and avoid town-owned roads; the interfacing public road system must maintain Southbury’s default level-of-service standard. The town may hire an independent traffic engineer, with the applicant paying the cost. traffic and access
Data centers must demonstrate adequate access to high-capacity electric service and fiber-optic telecommunications. Backup generators and batteries must comply with fire code and be fully screened. data center requirements
For data center applications, renewable-energy measures and waste-heat reuse and energy-efficient cooling technologies are required. data center energy measures
Energy-generation facilities are prohibited in the IND Zone. prohibited uses
Parking cannot be within 150 feet of a street or within 300 feet of a residential property boundary; required parking and loading must also comply with zoning rules. parking and loading
A landscaped buffer at least 20 feet wide is required along property lines abutting non-industrial zones unless the natural environment already provides one. Buffer landscaping must receive annual licensed-arborist inspections, with reports submitted for five years after site completion and issuance of a zoning-compliance certificate. buffering and screening
Lighting must be controlled and shielded so fixtures are not visible from specified roads, and must meet dark-sky requirements. lighting requirements
Noise at residential property lines is limited to 75 dB during daytime operations and 55 dB at night. Backup generators must have sound-attenuating enclosures and may operate only for testing or during a power outage, ceasing when standard power is restored. noise limits
Mechanical equipment must be screened from streets and abutting property lines, and also from publicly accessible or occupant-accessible locations within the site. mechanical equipment screening
Sanitary waste disposal must meet state public-health requirements; industrial waste may not be discharged to ground or surface waters, and off-site sewage systems may not be expanded to serve the site or its buildings. sewage requirements
The Planning Commission may require off-site improvements as part of a special-exception application, including roadway, traffic-control, sidewalk, emergency-access, landscaping or infrastructure work. off-site improvements
Applicants must demonstrate that the property or building can be repurposed or redeveloped in a way that continues to benefit the town. future use of site
Benefits & exceptionsHide benefits & exceptions4
Data centers are expressly allowed in the Industrial (IND) Zone as a special-exception use, subject to site development plan approval and the listed zoning requirements. Applications also require traffic and environmental impact analyses at the applicant’s expense. Data Centers
An IND-zone development may include multiple principal uses in the same building or structure, allowing a data center to share a building with another principal use. More than one principal use
Data centers may be part of an authorized integrated industrial park with multiple buildings on one parcel or contiguous parcels. The park must meet additional conditions, including minimum 80,000-square-foot primary buildings, access from state roads or highways without using town-owned roads, and access and infrastructure agreements filed on the land records. Industrial park
Industrial-park developments may use shared facilities, including utilities, parking, loading docks, and stormwater systems, subject to binding agreements addressing access, use, maintenance, cost sharing, and enforcement. The agreements require Planning Commission and Town Counsel review and must be filed before a zoning permit is issued. Shared facilities