Loading map…

City of Middletown

Neutral Data Center Policies

Middletown allows data centers in some business and industrial zones, while others require a special exception. Design, screening, lighting, parking, and loading rules add requirements but do not ban them.

current law · City of Middletown
Sets data-center-specific standards for building design, screening mechanical equipment, directing outdoor lighting away from neighbors, buffering sites next to residential zones, employee parking, and loading space.Middletown Connecticut Zoning Code §§ 5.6.8.45 and 6.1.02.39 (effective August 19, 2026)

What this means

The code allows data centers in some business and industrial zones, and allows them by special exception in others, creating a modest opportunity for development. Design, equipment-screening, lighting, parking, and loading rules add some costs, but do not amount to a ban or unusually heavy burden (data center use listings; data center design standards).

People behind it

  • May initiate zoning-code amendments and approves applications to amend the Code. “Initiative of the Commission”

  • Its staff may petition for amendments, and the Department administers the City’s land-use regulations. “Petition by the Department of Land Use Staff”

Restrictions & requirementsHide restrictions & requirements8
  • Data centers are allowed only in districts where the use schedule lists them as permitted or as a special exception; an unlisted use is prohibited. The schedule identifies data centers in both categories.

  • Where a data center requires a special exception, it needs Planning and Zoning Commission approval and must meet the special-exception findings; a public hearing is required. Approval lasts one year, with a possible renewal for one additional equal period. Special exceptions require findings and a public hearing.

  • Site plan approval or zoning compliance is required for applicable development, and data-center plans must include an advisory opinion from the Design Review and Preservation Board. The data-center standards require an advisory opinion with the site plan.

  • Street-visible building façades must include at least two specified design elements, such as changes in height, step-backs or recesses, windows, or changes in materials or color. Façades must include at least two design elements.

  • Ground-level and rooftop mechanical equipment must be screened from adjacent roads and properties, using the building or a visually solid screen. Mechanical equipment shall be screened.

  • Exterior lighting must use cutoff, fully shielded fixtures directed downward and inward, away from adjacent roads and properties. Fixtures must direct light downward and into the property.

  • If the property abuts a residential zone, the data center must be sited and buffered using natural topography and existing vegetation, supplemented if needed with new vegetation and a landscaped earthen berm. The buffer requirement applies to properties abutting a residential zone.

  • Data centers must provide one parking space per employee on the major shift and one loading space. The parking schedule sets one space per major-shift employee.

Benefits & exceptionsHide benefits & exceptions5
  • Data centers are expressly listed as permitted uses in designated non-residential zones and as special-exception uses in other designated zones. A special exception requires Commission approval and compliance with applicable standards. Data Centers

  • Accessory uses may include data processing and storage, as well as employee-convenience services, supporting related functions at a principal use. They must satisfy the accessory-use limits, including being on the same lot and subordinate to the principal use. data processing and storage

  • The parking schedule sets data centers’ requirement at one parking space per employee on the major shift, rather than a floor-area-based formula. 1 Parking Space per employee on the major shift

  • A data center is required to provide one loading space. A Data Center shall require one loading space

  • A legally existing nonconforming data-center use may continue without change. This protection does not allow structural expansion; changing to another nonconforming use requires Commission approval and the new use must be less intensive. Nonconforming Uses may continue to exist

Sources

Cookie preferences · Report missing data