Town of East Hampton
Neutral Data Center Policies
East Hampton town limits working hours and requires approval of equipment locations and plans to reduce noise, dust, and erosion for specified construction projects using rock crushers or similar equipment. These rules do not directly restrict data-center operations.
current law · Town of East HamptonLimits data-center construction using rock crushers, pneumatic or hydraulic hammers, or similar equipment to Monday–Saturday, 8 a.m.–4:30 p.m., and requires approval of equipment locations and measures to control noise, dust, and erosion.East Hampton Zoning Regulations (December 2025)
What this means
The measure would modestly burden data-center construction that uses rock crushers or similar equipment: it limits work hours and requires equipment locations and ways to reduce noise, dust, and erosion to be approved (construction limits). These rules do not directly restrict day-to-day data-center operations, and they apply only to specified projects and equipment.
People behind it
- Town of East Hampton Planning and Zoning Commission
Named applicant proposing the amendment on material processing and construction activity.
- Planning and Zoning Official
Authorized to approve equipment locations and mitigation methods under the amendment.
- Zoning Enforcement Officer
Designated to enforce the zoning regulations, including the amendment.
Restrictions & requirementsHide restrictions & requirements11
Before construction or use, a project must comply with the rules for its zoning district and obtain a Zoning Certificate of Approval; a building permit cannot be issued first. No land shall be used without that certificate.
Where the proposed use requires site plan approval, the applicant must submit a site plan and may need to show that other agencies with jurisdiction have reviewed and accepted the plans. Site Plan application requirements apply.
Uses that require a Special Permit must go through a public hearing; the Commission may approve, deny, or impose conditions after evaluating the application. All applications for Special Permit require a hearing.
In the Commercial, Village Center, Design Development, and Professional Office/Residential zones, site plans for new construction of structures over 5,000 square feet require a public hearing, except middle housing applications. New construction of structures over 5000 square feet triggers the hearing rule in those zones.
Excavating, removing earth, filling, or grading generally requires a permit, subject to listed exceptions such as ordinary maintenance and work covered by approved development plans. For work areas up to 5,000 square feet, an administrative permit may be available; it requires a $25 fee and lasts no more than six months. A Permit ... shall be required.
For covered construction or material processing involving rock crushers, pneumatic or hydraulic hammers, or similar equipment, work is limited to Monday through Saturday, excluding legal holidays, from 8 a.m. to 4:30 p.m.; the Commission may further restrict hours. Equipment locations and noise, dust, and erosion controls must be specified and approved. Exceptions include specified public-utility work, road repairs, and emergency work. Monday – Saturday
A soil erosion and sedimentation control plan is required when a development disturbs more than one-half acre, with a single-family dwelling not part of a subdivision excepted. The approved control measures must be installed, and their cost must be covered by a performance bond. more than one-half (1/2) acre
Commercial and industrial lighting is subject to limits on illumination and light trespass, including a maximum of 0.05 foot-candles at boundaries adjoining residential zones and 0.5 foot-candles at other property boundaries. Outdoor lighting must be shut off or reduced within one hour after site activity ends. within one (1) hour
Parking must be provided under the applicable parking rules. For uses not listed in the regulations, the Commission determines the required range by reference to the closest similar use; applicants may have to justify the proposed number of spaces. uses not listed
Site improvements may require performance, landscape, and erosion-control bonds. The applicant must bond the cost of covered improvements, and completed work must have a maintenance bond of at least 10% of the original bond for at least one year and no more than three years. Maintenance Bonds
A change to an existing non-residential use that alters or reconfigures buildings, parking, access drives, or the site layout requires a Change of Use application and Commission review; depending on the change, site plan or Special Permit approval may be required. Any proposed change in use