City of Ansonia
Pro-Data Center Policies
Connecticut offers qualifying data centers long-term tax exemptions on property, equipment, services, and electricity, but projects must meet investment thresholds and negotiate a fee agreement with each host municipality before construction. The state also provides applicant assistance and interagency coordination.
Rating and summary from Connecticut statewide as there are no scored current or future laws outside temporary restrictions for City of Ansonia.
unknown · City of AnsoniaRequires data centers to follow Ansonia’s general zoning and site-plan rules, but sets no data-center-specific requirements.No Ansonia-specific data center law identified
What this means
The rules do not name data centers, and uses not listed as permitted are prohibited, so a facility’s approval may depend on how the city classifies it. If allowed, permits and site requirements could add meaningful costs and delays, but the rules do not impose a data-center-specific ban or moratorium.
Timing
- Ends
- May 31, 2007
The off-street parking moratorium was to last six months after its effective date, but no later than 2007-05-31. The appendix also records a separate subdivision moratorium extended until 2003-06-01.
People behind it
- Planning & Zoning Commission
Reviews and acts on land use applications and adopts and amends the City’s zoning regulations.
Restrictions & requirementsHide restrictions & requirements10
Any land or building use not listed as permitted in Schedule B is prohibited. Data centers are not expressly listed, and the regulations do not specify whether one could qualify under another listed use. Any use not specified in Schedule B
A zoning permit is required before construction, enlargement, extension, structural alteration, excavation, or a change in use; a certificate of zoning compliance is required before a property may be used or occupied. No building or other structure.
District-specific limits on lot size, yards, setbacks, height, building coverage, and impervious surfaces apply; the limits vary by zoning district. Schedule of Yard, Lot and Bulk Requirements.
If a proposed use is subject to site-plan approval or a special permit under Schedule B, that approval is required before the zoning permit or commencement of the use. Special permits require a public hearing and may be conditioned or denied under the listed standards. Prior to issuance of a Zoning Permit.
For uses that do not fit the listed parking categories, the Commission determines reasonable and appropriate parking requirements. Required parking and loading must be established before a certificate of occupancy is issued. uses which do not fall within the categories listed above.
Development in a special flood hazard area requires a Flood Hazard Area Permit. Nonresidential structures must have the lowest floor at least one foot above base flood elevation or meet the specified floodproofing and certification requirements. only in accordance with the requirements of this Section.
A certified soil-erosion and sediment-control plan is required for disturbed areas of at least one-half acre, and when specifically required for site plans or special permits. A bond may be required, and site work cannot begin until the plan is certified, the bond is posted, and required initial measures are installed. disturbed area of one half (1/2) acre or more.
Excavation, grading, or removal of natural material generally requires a temporary special exception unless an exemption applies. The exemption for work directly connected to permitted construction covers no more than 400 cubic yards; the application provision sets a $500 fee, and permitted work also incurs an inspection fee. no more than four hundred (400) cubic yards.
Driveway construction, reconstruction, repaving, resurfacing, or relocation requires a permit. Driveways serving uses other than single-family residences are subject to a maximum grade of eight percent, along with other grade and width limits. No person shall construct, reconstruct, repave.
All uses must meet performance standards governing emissions, odors, noise, waste discharge, vibration, hazardous substances, glare, drainage, and heat. The following performance standard shall apply to all uses.