City of Englewood

Anti-Data Center Policies

Englewood requires new main buildings to have an improvement plan and meet design, access, landscaping, and utility rules, which may add cost and delay. Data centers are not specifically banned or promoted; permission depends on zoning and city classification.

current law · City of Englewood
Applies Englewood’s general zoning, site-plan, infrastructure, and operating rules to data centers without imposing data-center-specific regulations.Englewood Municipal Code, Title 16 (Unified Development Code)

What this means

New principal buildings would need a site improvement plan and must meet design, access, landscaping, and utility requirements, which can add costs and delays (site improvement plans are required for new principal structures). The measure does not specifically ban or promote data centers, and whether one is allowed depends on its zoning district and how the city classifies it.

People behind it

  • May initiate text amendments, worked with City staff on amendments, and adopted CodeNext on September 25, 2023.

  • May initiate text amendments and reviews and recommends amendments to the Code.

  • Worked with City Council on amendments to the Unified Development Code.

Show 3 more peopleShow fewer people
  • Responsible for administering the development code and serves as its principal interpretation and enforcement official.

  • May make decisions delegated to City staff under the Code.

  • Responsible for enforcing the Code’s provisions and authorized to investigate and pursue violations.

Restrictions & requirementsHide restrictions & requirements8
  • Data centers are not expressly listed in the use table. The Director may classify one as equivalent to a listed use based on its scale, operations, and typical site design; if it cannot be treated as equivalent, it may be allowed only through a development-code amendment. Uses not anticipated

  • Development or use of land cannot begin until required reviews are completed, standards are met, and approvals and permits are issued. A site improvement plan is required for any new principal structure and for certain expansions or alterations, including increases in floor area or footprint of more than 10%. Any new principal structure

  • If the applicable use classification requires a conditional use permit, the application requires a public hearing and review of compatibility and potential impacts; the permit may include conditions or a limited term. Conditional use permit

  • Applicants must pay the established, non-refundable application fee. The City may also require technical studies, such as traffic, infrastructure, noise, or environmental analyses, and the applicant must pay their costs. Costs of all studies

  • If required public improvements are insufficient and are not covered by a development agreement, the applicant must construct them and provide a performance bond, letter of credit, or similar security equal to 125% of estimated construction costs. 125% of the estimated cost

  • Operations must comply with limits on nuisance impacts beyond the lot boundary. In industrial districts, sound inherently and consistently generated may not exceed 70 decibels at any lot boundary; additional limits apply to vibration, emissions, and outdoor storage. Does not exceed seventy (70) decibels

  • Site lighting must meet district-specific limits at property lines, including lower limits next to residential uses. Exterior fixtures generally must be fully shielded, and direct illumination must be confined to the property. Fully shielded

  • Site improvement plan approval generally lasts one year. A one-year extension may be granted if relevant conditions, standards, and policies have not changed; if permits are not issued before approval lapses, a new application is required. Valid for one year

Benefits & exceptionsHide benefits & exceptions10
  • The Director may allow related development applications to be processed concurrently. They receive the highest required review level, and none is final until all related decisions are made. Applications may run concurrently

  • The Director may waive application information that is inapplicable to the review criteria, and the City must determine whether an application is complete within ten days of filing. The Director may waive required information

  • A Planned Unit Development (PUD) may use flexible standards that differ from ordinary district standards. It must provide qualifying public or community benefits, propose development not achievable under ordinary standards, meet minimum site-area requirements, and be initiated by all property owners within its boundaries. PUDs provide flexibility

  • Administrative adjustments may allow limited deviations from dimensional standards: up to 15% for setbacks, 5% for lot width or area, and 10% for other dimensional standards except height. The adjustment must meet the stated criteria, including equally or better meeting the standard’s intent, and cannot exceed the limits. Adjustments are limited by Table 2-2

  • If an applicant builds a planned larger public facility, the City may require reimbursement for the portion of required improvements constructed beyond the project’s impact. Reimbursement for improvements beyond the project’s impact

  • Parking requirements may be reduced through qualifying adjustments, including up to 30% for certain uses within a quarter-mile of a light-rail station, up to four spaces or 20% for qualifying pedestrian and bicycle access, and shared parking supported by recorded agreements. Parking reductions

  • Certain approved site-specific development plans establish vested rights for the approved development terms, including type and intensity, for three years from publication. A development agreement may provide a longer term, subject to exceptions that allow certain new rules to apply. Vested rights remain for three years

  • An approved PUD plan does not expire and controls future development of the property unless it is amended, replaced, or the property is rezoned. A PUD plan does not expire

  • Lawfully established nonconforming uses may continue, but generally cannot be expanded or moved and lose continuation rights if discontinued for at least 180 days. Qualifying lawful nonconforming structures may also continue, subject to limits on changes and restoration. Lawfully established uses may continue

  • Permits and other administrative approvals issued before the Code’s effective date remain valid for their specified duration or the duration under the prior Code; if neither sets a duration, they remain valid for six months. Later changes to those approvals are subject to the new Code. Prior approvals remain effective

Sources

pending · City of Englewood
Recommends that Englewood temporarily pause permits and construction for new data centers while the city considers regulations to address their impacts.Sustainability Commission Recommendation to Adopt a Data Center Development Moratorium

What this means

The proposed moratorium would stop new data center applications, permitting, siting, and construction while the city reviews possible rules. It does not set a duration or address existing operations, but it would make building new centers substantially harder during the moratorium.

Timing

The sources recommend a moratorium on new data center applications but do not specify its duration or expiration.

People behind it

  • Recommended that City Council adopt a moratorium on data center permitting, siting, and construction.

  • Assigned to draft the Commission’s memo to Council on a data center moratorium.

  • Assigned to draft the Commission’s memo to Council on a data center moratorium.

Restrictions & requirementsHide restrictions & requirements6
  • A proposed moratorium would halt new data center applications and prohibit permitting, siting, and construction of data centers in Englewood. No duration or end date is specified.

  • Data center applications would have to disclose quantified water and energy needs, emissions, and noise levels; claims about job creation would have to be supported by data.

  • A community-led review would assess water, electricity, air-quality, and land-use impacts and recommend whether to impose permanent prohibitions or conditional-use requirements. No review timeline is specified.

  • The review could recommend permits for extra water or energy use.

  • The review could recommend energy surcharges tied to excess water use or kilowatt-hours per square foot.

  • The review could recommend requiring renewable energy and battery storage.