City of Pasadena

Anti-Data Center Policies

Los Angeles County bars large-scale data centers in unincorporated areas, while a separate measure calls for study and outreach and only preparation of a possible moratorium.

Rating and summary from Los Angeles County as there are no scored current or future laws outside temporary restrictions for City of Pasadena.

pending · City of Pasadena
Recommends that Pasadena consider banning large data centers or, if allowed, require strict environmental, utility-use, public-review, and financial safeguards.Environmental Advisory Commission Utility Usage Projects Letter (Draft) — August 2026

What this means

The proposal says the City should consider banning new resource-intensive projects, and otherwise calls for strict requirements, reviews, public reporting, and developer-paid infrastructure. These measures could make building or expanding a data center substantially harder and more expensive, though the document does not make a ban definite.

People behind it

  • Proposed the policy recommendations, stating that it recommends the City Council direct staff to develop policies. The Commission recommends

  • The Commission asks the Council to direct staff to develop the policies. Direct staff

  • Identified as responsible for developing the policies, in coordination with Pasadena Water and Power, the Planning Commission, and the community. Develop policies

Show 2 more peopleShow fewer people
  • Identified as a coordination partner in developing the policies. In coordination with Pasadena Water and Power

  • Identified as a coordination partner in developing the policies. The Planning Commission

Restrictions & requirementsHide restrictions & requirements17
  • The Commission recommends that the City consider banning new large-scale resource-intensive projects, including large data centers; this is a proposed ban, not a stated moratorium or enacted prohibition. Consider a ban

  • If projects are not prohibited, the recommended rules would apply broadly to resource-intensive projects, with examples including peak demand above about 10 MW, potable-water use above 100,000 gallons per day, defined noise thresholds, or other measurable infrastructure impacts. Projects exceeding ~10 MW peak demand

  • The Commission recommends a new utility rate class and a discretionary review process, including review of energy and water use, discharges, flood risk, noise, air pollution, and consistency with City plans, codes, and ordinances. Establish a new rate class and discretionary review process

  • The recommended policy would restrict project locations or districts where the projects conflict with housing, neighborhood, or specific plans. Restrict locations or districts

  • The City would be asked to disclose projected electricity use, water demand, and noise levels at least 90 days before taking action on a project. At least 90 days prior to City action

  • The Commission recommends prohibiting non-disclosure agreements between the City and any party associated with a covered project. Prohibit non-disclosure agreements

  • Covered projects would have to provide periodic public reports of actual energy and water use, noise levels, and air pollution throughout the project’s life. Over the life of the project

  • The recommended water standard requires closed-loop water systems. The Commission also recommends working with the Raymond Basin Board to require such systems of all its members. Require the use of closed loop water systems

  • Projects would have to purchase and use carbon-free electricity with hourly matching consistent with Pasadena’s climate goals; auxiliary gas generators would not be permitted. Hourly matching consistent with Pasadena’s climate goals

  • Projects would have to install on-site battery storage, participate in utility demand-response programs, and incorporate flexible and interruptible loads. Require on-site battery storage

  • Projects would have to mitigate noise, including meeting nighttime noise standards. Including compliance with nighttime noise standards

  • Projects would have to provide landscaping that shades 75% of sidewalks to address urban heat. Provide 75% shading on sidewalks

  • Projects involving adaptive reuse would have to provide a life-cycle assessment of greenhouse-gas emissions from materials, construction, and demolition of existing buildings. Require a life cycle assessment

  • Developers would have to pay the full cost of transmission, distribution, and necessary infrastructure upgrades, without shifting those costs to existing ratepayers. No cost shifting to existing ratepayers

  • Project-funded construction and infrastructure-upgrade work would have to pay prevailing wages, to the extent not already required by law. Pay wages at or above the prevailing wage

  • Any financial incentives, such as tax breaks, would be conditional on measurable outcomes, including local hiring, renewable energy use, closed-loop water systems, noise mitigation, and community and energy-system investments. Make any financial incentives conditional on measurable outcomes

  • Developers would have to provide a decommissioning bond or similar financial assurance sufficient for site cleanup, infrastructure removal, and environmental remediation. Require a decommissioning bond

Benefits & exceptionsHide benefits & exceptions1
  • The City may offer financial incentives, such as tax breaks, but they must be conditional on measurable outcomes including local hiring, renewable energy use, closed-loop water systems, noise mitigation, community investment, and energy-system upgrades.